Skip to content

Alley House 2 – LEED Platinum Prefab

This super energy efficient, green in-fill spec home located in Madison Valley is one of Seattle’s 1st LEED Platinum prefabs.

Green Spec project by Cascade Built:

3 Stories | 3 Bedroom | 2.5 Bathroom | 1687sf | 1-Car Garage

  • Designed by award-winning David Foster Architects
  • LEED Platinum certification (targeting, completion fall 2011)
  • Prefabricated modules by Method Homes
  • Heat Pump heating and A/C (2-3x efficiency, lower utility bills)
  • Heat Recovery Ventilation (superior air quality, lower utility bills)
  • SeriousWindows (much better energy performance, lower utility bills)
  • Designed for optional conversion of daylight basement to ADU unit or office, fully insulated garage
  • Solar pre-wired for PV and hot water
  • Optional green roof
  • Next door to our first LEED Platinum Alley House
  • In-fill lot in Madison Valley, 2 blocks to shops, restaurants & grocery. Very Walkable.
Back To Top